NO

DESCRIPTION

CLIENT YEAR

1

Marine Debris and Jack-up approach
Survey (Adjacent to NEFS for JUB SSS Installation Works)

Technixs / SPDC

July, 2017

2

Bathymetry and Wreck Survey

Humber/ Aveon Offshore

June, 2017

3

Search and recovery Survey

Nigerian Navy

March, 2017

4

Meren Platform cable Route Survey

Chevron/ Era J

March, 2017

5

24’’ Okan Gas Import Pipeline post- installation survey Chevron Field

Ranger Subsea / Chevron

February 2017

6

24’’ Okan Gas Import Pipeline repair
positioning survey support Chevron Field

Ranger Subsea / Chevron

Dec 2016 – January 2017

7

24’’ Okan Gas Import Pipeline pre- installation survey Chevron Field

Ranger Subsea / Chevron

Nov, 2016

8

OQPP Onshore Pipeline and
Geotechnical Survey

Exxon Mobil / Deltaafrik

Oct- Nov 2016

9

12’’ subsea Pipe lay Positioning Support from South bank to NEFS
Conoil Field

Ranger Subsea / Conoil

February 2016
Oct 2016

10

Subsea Cable shore Land, Protection
and Burial at Goshen BeachLagos

Vewat / SAT 3 Consortium

March, 2015

11

Subsea Cable LayPositioning
Support at Lagos Offshore for SAT 3 Consortium

Humber Marine / SAT 3 Consortium

December, 2015 January

12

Pre-Lay Survey for Fiber Optics
Subsea Cable Lay at Lagos Offshore for SAT 3 Consortium

Vewat /SAT3 Consortium

November, 2015

13

Post Wreck Survey of Dibi Survey

Chevron Nig Ltd/ Humber
Marine

November, 2015

14

12’’ subsea Pipe lay Positioning
Support from South bank to NEFS Forcados Field

Gladtrico /OPI/SPDC

August, 2015
February 2016

15

Subsea Cable LayPositioning
Support at Forcados Field

Natony / OPI/SPDC

June, 2015
On-going

16

12’’ Pipeline route survey from South
bank to NEFS Forcados Field

OPI / SPDC

March, 2015

17

Pre-Lay Survey for Subsea Cable Lay
at Forcados Field

Natony / OPI/SPDC

February, 2015

18

Scarabeo 3 Semi-Submersible Rig Position @ OKD-5 Okwori Field

Addax Petroleum / Eraldom Nigeria

December,2014

 

19

Subsea Cable Lay pre-installation survey at Forcados Field

OPI / SPDC November,2014
20

Scarabeo 3 Semi-SubmersibleRig
Position @ OKD-27 OkworiField

Addax Petroleum / Eraldom
Nigeria
October,2014
21 Pipeline route survey of Trans Ramos
pipeline Agge Filed
Nigerdive / SPDC October, 2014
22 Escravos River pipeline crossing
survey
Nigerdive / SPDC September, 2014
23

Scarabeo 3 Semi-Submersible Rig
Position @ Asha 6 Okwori Field

Addax Petroleum / Eraldom
Nigeria
August,2014
24

Topographical Survey of Flowline and Well Fix of Well O,N,P in OredoField

Nigerian Petroleum DevelopmentCompany
(NPDC)
July, 2014
25 Scarabeo 3 Semi-Submersible Rig
Position @ ok-14 Okwori Field
Addax Petroleum / Eraldom
Nigeria
June,2014
26 Offshore pipeline Rout Survey atAgee SPDC/ Nigerdive Ltd May,2014
27 Topographical Survey of Access road and Hydrographical Survey of Orashi
River
Nigerian Petroleum DevelopmentCompany
(NPDC)
April, 2014
28 Swath Bathymetric Survey of
Escravos Entrance
NPA / Humber Marine Werks
Company Ltd
March, 2014
29

Scarabeo 3 Semi-Submersible Rig
Position @ ok-D10 Okwori Field

Addax Petroleum / Eraldom
Nigeria
February,
2014
30 Offshore Pipeline Route Survey MG3 / Afren January, 2014
31 Scarabeo 3 Semi-Submersible Rig
Position @ ok-15 Okwori Field
Addax Petroleum / Eraldom
Nigeria
November,
2013
32 Scarabeo 3 Semi-Submersible Rig
Position @ okd-2 Okwori Field
Addax Petroleum / Eraldom
Nigeria
September,
2013
33 Scarabeo 3Semi-Submersible Rig
Position @ ok-29 Okwori Field
Addax Petroleum / Eraldom
Nigeria
August, 2013
34

Geophysical / Seabed survey of Warri
channel to Excravos Fairway Buoy ( 228km)

NPA / Humber Marine Werks Company Ltd

March, 2013
35 Swath Bathymetric Survey of
Escravos Shipping Channel Entrance
NPA / Humber Marine Werks
Company Ltd
December,2012
36 Rig Positioning @ Okono I NPDC September, 2012
37 Sea Bed / Geophysical site survey for
Rig Positioning @ Okono H & I
Nigerian Petroleum
Development Company.
August, 2012
38 Geo-hazard survey For Rig
Positioning of Oso PP
Exxon Mobil /GOSL May, 2012
39

Geotechnical Soil Investigation for the Transmission Tower Lines.

PHCN/TCN/IPP (Sub-
contract Miden Systems Ltd.)
July,2011
40 Geotechnical and Topographic Investigation of Ajaokuta-Abuja- Kano-Katsina Gas pipeline Route
Survey.
Federal Ministry ofPetroleum Resources, Sub-contract from AtlasInternational
Engineering Services
2011
41

Topographic Survey for Gas Supply Expansion Project (GSEP).

Chevron Nigeria Limited / Hyundai Heavy Industries, contract awarded by Worley
Parsons R & E Houston

2010
42

Near Shore Geophysical for Critical Crude pipeline replacement project.

Mobil Producing Nigeria Unlimited. Contract awarded by Deltaafrik Engineering Limited and Subcontracted by
Geoville Consulting Limited

2009

LIST OF ONSHORE / OFFSHORE GEOPHYSICAL AND GEOTECHNICAL PROJECTS

 

  1. Geotechnical Soil Investigation for Midwestern Oil and Gas 400,000 Barrel Tank Farm at KwaleDelta State 30mtrs
  2. Geotechnical Soil Investigation and Geophysical survey for engineering designof Beach Manhole Lakki Beach, Lagos State. November, 2015(40m)
  3. Preliminary Geotechnical Investigation of NPDC Well O at Olobo field, Edo State September2015                      (30mtrs)
  4. Preliminary Geotechnical Investigation of NPDC Well N,EdoState July 2015                               (30mtrs)
  5. Preliminary Geotechnical Investigation of NPDC Well P at Olobo Field, Edo State June,2015 (30mtrs)
  6. Preliminary Geotechnical Investigation of NPDC Well Q at Olobo Flow stationEdo State March,2014                        (30mtrs)
  7. Geotechnical Investigation and Geophysical survey of Ozorro Flow Station expansion Alternaye Tank Farm, OzorroDeltaState February, 2014 (60mtrs)
  8. Abalamabie Waterfront shore protection Project, subcontract by NDDC February, 2014
  9. Geophysical survey at Krake Tank Farm, Krake, Benin Republic, subcontract by GOSL/SAPETRO Nov/Dec 2013
  10. Onshore Geotechnical soil investigation at Krake Tank Farm, Krake Benin Republic, subcontract by GOSL/SAPETRO Nov/Dec 2013                       (70mtrs)
  11. EGP3 Geotechnical Soil Investigation For Crossing Support at DeltaPlatfform, Chevron field subcontractbyWAV/CNL May/June2012               (100mtrs)

 

  1. Core Drilling for Mineral Exploration at Abakaliki contract awarded by Ebonyistate Ministry of Cement and Mineral resourcesFeb/March2012 (60mtrs)
  2. Geotechnical Soil Investigation for the Transmission TowerLines.
  3. Spurd Scan Investigation and Analysis for Platform Installation at Addax Field Subcontract award bySuper-Geomatics/Addax Mar/April 2011           (100mtrs)
  4. Geotechnical Soil Investigation at Kano Gas pipeline Spool Line. -Subcontract awardbyTracon/MPR Jan/Feb2011         (30mtrs)
  5. Geotechnical Soil Investigation at Abuja Gas pipeline spool line. -Subcontract awardbyTracon/MPR Jan/Feb2011         (30mtrs)
  6. Geotechnical Soil Investigation at Gas pipeline from Kano – Katsina. -Subcontract awardbyTracon/MPR Jan/Feb2011         (30mtrs)
  7. Geotechnical Soil Investigation For Gas Supply Expansion Project at Escravos: Subcontract award by Geoville Deltaafrik / ChevronJune/July2010 (60mtrs)
  8. Geotechnical Soil Investigation of OBIO/OBEN Gas Pipeline Project fromOmoku Rivers State – Oben Edo State; Subcontract award by Petrogas / MPR March/April2010 (30mtrs)
  9. Geotechnical Soil Investigation for Gas pipeline from Ajokuta- Kano. -Subcontract award by Tracon/MPRJan/Feb2011 (30mtrs)

 

  1. Geotechnical & Geophysical Site Survey of Offshore Wind Energy Generation Plant at Monrovia, Contract awarded by Atlantic Geomantic Limited Liberia June/July 2010 (40mtrs)
  2. Near shore Geotechnical & Geophysical Site Survey at Monrovia Sea port. Contract awarded by Atlantic GeomanticLimitedLiberia     June/July2010       (40mtrs)
  3. Sand search, Volumetric & Laboratory analysis of soil sample for Delta Glass Nig. Ltd 24.Geotechnical Investigation for the proposed Technical College and Town Hall Project in Bonny for Nigeria Liquefied Natural Gas–Subcontractor from Polak Nigeria Limited. Feb/March 2009
  1. Nearshore Geotechnical Survey at Qua Ibom Terminal (QIT) Contract awarded by Geoville Consulting/ DeltaAfrik Engineering Company Limited / Exxon Mobil.(Completed)
  2. Onshore Geotechnical Survey of IDOH & UBIT export pipeline Contract awarded by GPSL/ DeltaAfrik Engineering Company Limited /ExxonMobil,.    (Completed)