Geocadinal Integrated Services Limited has over Thirty Five (35) past and present projects, ranging from Surveying, Positioning, GIS, Borehole Drilling and Completion, Geotechnical Site Investigation, Geophysical survey and logging, water treatment system, water storage system and distribution and Environmental Services all over the country particularly in Niger Delta Region and other parts of the country.
We are particularly keen on this Trans Nigeria Gas Pipeline Project because we pioneered and undertook the all the field works in the first phase of this project called Ajaokuta-Abuja-Kano-Katsina pipeline route survey and Above Ground Facilities Geotechnical. (AAKK) By Atlas Engineering Nigeria Limited in February 2011.
Please find below lists of all our previous and on-going milestone project of similar nature
- 746KM Preliminary Investigation (PI) Survey of NNPC Gas pipeline from Ajokuta- Kano. -Subcontract award from Bat Oil Services/NNPC
- As-Built Survey of Bonny Terminal Integrated Project, Contract awarded by Hyundai Heavy Industries Limited / SPDC (Completed)
- Jack-up Barge Positioning of Black Jack, Herculux Marine (Completed)
- Full spread survey of Nun River (from Brass Entrance- Gbaran) Contract awarded by Daewoo Nigeria/ SPDC
- Jack-up Barge Positioning of Bonefish, Herculux Marine/ Deltaafrik (Completed)
- Barge Positioning/ Tug management of Barge Major, Technip offshore/ Exxon Mobil (Completed)
- Barge Positioning/ Tug management of HD 1000, Hyundai / Exxon Mobil (Completed)
- 48’’ Pipeline Route Survey from Bonny Terminal to Bonny Beech for Shell Petroleum Development Company. Contract awarded by Hyundai Heavy Industries Limited (Completed)
- Pre-dredging/ post dredging Survey of Afam V Power Station from Okoloma Flow Station. Contract awarded by National Electric Power Authority and Siemens. (Completed)
- Nearshore Geophysical site survey for EGG Gas project Deltaafrik / Exxon Mobil (Completed)
- Acoustic positioning of Well Head, Umbilical and Flow line installation @ Okwori Field. Contract awarded by WAOS / Addax
- Barge Positioning/ Tug management of DB Donoux Barge for Riser repair, Contract awarded by WAOS / Addax
(Completed)
- Platform inspection and trenching of pipeline route at Atlas Cove. Wilbrose / NNPC Project. Contract awarded by Wilbros Nigeria Limited. (Completed)
LIST OF WATER TREATMENT PROJECT EXECUTED
| S.NO | CLEINT AND LOCATION | TYPE | STATUS |
| 1. | Kula Water Project, Rivers State | Community water treatment | Completed |
| 2. | Belema Water Project, Rivers State | Project camp water treatment | Completed |
| 3. | Opobo Water Project, Rivers State | Community water treatment | Completed |
| 4. | Yenaka Water Project, Bayelsa State | Community water treatment | Completed |
| 5. | Orlando Court Water Project, Rivers State | Residential water treatment | Completed |
| 6. | NPA Quarters Water Project, Rivers State | Camp water treatment | Completed |
| 7. | Bosun Ayinde Water Project, Lagos State | Residential water treatment | Completed |
| 8. | Ojemaie Foods Water Project, Rivers State | Food factory water treatment | Completed |
| 9. | Botem Water Project, Ikorodu Lagos State | Water packaging Co. treatment | Completed |
| 10 | Tein George Water Project, V/Island Lagos |
LIST OF ONSHORE / OFFSHORE GEOPHYSICAL AND GEOTECHNICAL PROJECTS EXECUTED
- Geotechnical & Geophysical Site Survey of NNPC Gas pipeline from Ajokuta – Lokoja.. Subcontract awarded from BatOil Services/NNPC (On-going)
- Geotechnical & Geophysical Site Survey of Offshore Wind Energy Generation Plant at Monrovia, Contract awarded by Atlantic Geomantic Limited Liberia (Completed
- Near shore Geotechnical & Geophysical Site Survey at Monrovia Sea port. Contract awarded by Atlantic Geomantic Limited Liberia (Completed)
- Sand search, Volumetric & Laboratory analysis of soil sample for Delta Glass Nig. Ltd (Completed
- Investigation for the proposed Technical College and Town Hall Project in Bonny for Nigeria Liquefied Natural Gas–Subcontractor from Polak Nigeria Limited. (Completed)
- Sand search of Elelewon Creek to estimate the quality and quantity of the sand reserve of the area for Solar Associate Nigeria Limited, Aba road, Port-Harcourt. (Completed)
- Sand search & Soil investigation for Shoreline Protection at Shell Petroleum development Company location, Akiama Village Bonny–subcontract from Ikonobo Nigeria. (Completed)
- Geotechnical / Geophysical survey of Bonny terminal for Utility, Fire and Portable water well development, Bonny terminal integrated project, Contract awarded by Hyundai Heavy Industries Limited,. (Completed
- Geophysical survey of Bage Community, Calabar East Area of Calabar State to locate the best point for borehole location and to also determine the best aquifer horizon of the area for Portable water well development, FGN/EC Micro Project Programme for six states. (Completed)
- Nearshore Geotechnical Survey at Qua Ibom Terminal (QIT) Contract awarded by DeltaAfrik Engineering Company Limited/ Exxon Mobil,. (Completed)
- . Onshore Geotechnical Survey of IDOH & UBIT export pipeline Contract awarded by DeltaAfrik Engineering Company Limited/ Exxon Mobil,. (Completed
LIST OF ONSHORE/OFFSHORE SURVEYING AND POSITIONING PROJECTS
NO |
DESCRIPTION | CLIENT | YEAR |
1 |
Subsea Cable Lay Positioning Support at Lagos Offshore for SAT 3 Consortium | Humber Marine / SAT 3 Consortium | December, 2015
On-going |
2 |
Pre-Lay Survey for Fiber Optics Subsea Cable Lay at Lagos Offshore for SAT 3 Consortium | Vewart /SAT3 Consortium | November, 2015 |
3 |
Post Wreck Survey of Dibi Survey | Chevron Nig Ltd | November, 2015 |
4 |
12’’ subsea Pipe lay Positioning Support from South bank to NEFS Forcados Field | Gladtrico /OPI/SPDC | August, 2015
On-going |
5 |
Subsea Cable Lay Positioning Support at Forcados Field | Natony / OPI/SPDC | June, 2015
On-going |
6 |
12’’ Pipeline route survey from South bank to NEFS Forcados Field | OPI / SPDC | March, 2015 |
7 |
Pre-Lay Survey for Subsea Cable Lay at Forcados Field | Natony / OPI/SPDC | February, 2015 |
8 |
Scarabeo 3 Semi-Submersible Rig Position @ OKD-5 Okwori Field | Addax Petroleum / Eraldom Nigeria | December,2014 |
9 |
Subsea Cable Lay pre-installation survey at Forcados Field | OPI / SPDC | November,2014 |
10 |
Scarabeo 3 Semi-Submersible Rig Position @ OKD-27 Okwori Field | Addax Petroleum / Eraldom Nigeria | October,2014 |
11 |
Pipeline route survey of Trans Ramos pipeline Agge Filed | Nigerdive / SPDC | October, 2014 |
12 |
Escravos River pipeline crossing survey | Nigerdive / SPDC | September, 2014 |
13 |
Scarabeo 3 Semi-Submersible Rig Position @ Asha 6 Okwori Field | Addax Petroleum / Eraldom Nigeria | August,2014 |
14 |
|||
15 |
Topographical Survey of Flowline and Well Fix of Well O,N,P in Oredo Field | Nigerian Petroleum Development Company (NPDC) | July, 2014 |
16 |
Scarabeo 3 Semi-Submersible Rig Position @ ok-14 Okwori Field | Addax Petroleum / Eraldom Nigeria | June,2014 |
17 |
Offshore pipeline Rout Survey at Age | SPDC/ Nigerdive Ltd | May,2014 |
18 |
Topographical Survey of Access road and Hydrographical Survey of Orashi River | Nigerian Petroleum Development Company (NPDC) | April, 2014 |
19 |
Swath Bathymetric Survey of Escravos Entrance | NPA / Humber Marine Werks Company Ltd | March, 2014 |
20 |
Scarabeo 3 Semi-Submersible Rig Position @ ok-D10 Okwori Field | Addax Petroleum / Eraldom Nigeria | February,
2014 |
21 |
Offshore Pipeline Route Survey | MG3 / Afren | January, 2014 |
22 |
Scarabeo 3 Semi-Submersible Rig Position @ ok-15 Okwori Field | Addax Petroleum / Eraldom Nigeria | November,
2013 |
23 |
Scarabeo 3 Semi-Submersible Rig Position @ okd-2 Okwori Field | Addax Petroleum / Eraldom Nigeria | September,
2013 |
24 |
Scarabeo 3Semi-Submersible Rig Position @ ok-29 Okwori Field | Addax Petroleum / Eraldom Nigeria | August, 2013 |
25 |
Geophysical / Seabed survey of Warri channel to Excravos Fairway Buoy ( 228km) | NPA / Humber Marine Werks Company Ltd | March, 2013 |
26 |
Swath Bathymetric Survey of Escravos Shipping Channel Entrance | NPA / Humber Marine Werks Company Ltd | December,2012 |
27 |
Rig Positioning @ Okono I | NPDC | September, 2012 |
28 |
Sea Bed / Geophysical site survey for Rig Positioning @ Okono H & I | Nigerian Petroleum Development Company. | August, 2012 |
29 |
Geo-hazard survey For Rig Positioning of Oso PP | Exxon Mobil /GOSL | May, 2012 |
30 |
Geotechnical Soil Investigation for the Transmission Tower Lines. | PHCN/TCN/IPP (Sub-contract Miden Systems Ltd.) | July,2011 |
31 |
Geotechnical and Topographic Investigation of Ajaokuta-Abuja-Kano-Katsina Gas pipeline Route Survey. | Federal Ministry of Petroleum Resources, Sub-contract from Atlas International Engineering Services | 2011 |
32 |
Topographic Survey for Gas Supply Expansion Project (GSEP). | Chevron Nigeria Limited / Hyundai Heavy Industries, contract awarded by Worley Parsons R & E Houston | 2010 |
33 |
Near Shore Geophysical for Critical Crude pipeline replacement project. | Mobil Producing Nigeria Unlimited. Contract awarded by Deltaafrik Engineering Limited and Subcontracted by Geoville Consulting Limited | 2010 |
LIST OF WATER BASED PROJECTS
| S/N | PROJECT DESCRIPTION | CLIENT | YEAR |
| 1 | Construction of 40,000 Gallon Water scheme, complete with Generator, water treatment Facility and 4km reticulation Lines | Niger Delta Development Authority | 2015 |
| 2 | Construction of 4,000 Gallon Water Project For 7UP Company New site at Alote Eleme, Rivers State | 7UP Plc | 2014 |
LIST OF ONSHORE / OFFSHORE GEOPHYSICAL AND GEOTECHNICAL PROJECTS EXECUTED
- Geotechnical Soil Investigation for Subsea Cable route offshore Lagos State. November, 2015 (On-going)
- Geotechnical Soil Investigation for Midwestern Oil and Gas 400,000 Barrel Tank Farm at Kwale Delta State 30mtrs
- Geotechnical Soil Investigation and Geophysical survey for engineering design of Beach Manhole Lakki Beach, Lagos State. November, 2015 (40m)
- Preliminary Geotechnical Investigation of NPDC Well O at Olobo field, Edo State September 2015 (30mtrs)
- Preliminary Geotechnical Investigation of NPDC Well N, Edo State July 2015 (30mtrs)
- Preliminary Geotechnical Investigation of NPDC Well P at Olobo Field, Edo State June, 2015 (30mtrs)
- Preliminary Geotechnical Investigation of NPDC Well Q at Olobo Flow station Edo State March, 2014 (30mtrs)
- Geotechnical Investigation and Geophysical survey of Ozorro Flow Station expansion Alternaye Tank Farm, Ozorro Delta State February, 2014 (60mtrs)
- Geophysical survey at Krake Tank Farm, Krake, Benin Republic, subcontract by GOSL / SAPETRO Nov/Dec 2013
- Onshore Geotechnical soil investigation at Krake Tank Farm, Krake Benin Republic, subcontract by GOSL / SAPETRO Nov/Dec 2013 (70mtrs)
- EGP3 Geotechnical Soil Investigation For Crossing Support at Delta Platfform, Chevron field subcontract by WAV/CNL May/June 2012 (100mtrs)
- Core Drilling for Mineral Exploration at Abakaliki contract awarded by Ebonyi state Ministry of Cement and Mineral resources Feb/March 2012 (60mtrs)
- Geotechnical Soil Investigation for the Transmission Tower Lines.
- Spurd Scan Investigation and Analysis for Platform Installation at Addax Field Subcontract award by Super-Geomatics /Addax Mar/April 2011 (100 mtrs)
- Geotechnical Soil Investigation at Kano Gas pipeline Spool Line. -Subcontract award by Tracon/MPR Jan/Feb 2011 (30mtrs)
- Geotechnical Soil Investigation at Abuja Gas pipeline spool line. -Subcontract award by Tracon/MPR Jan/Feb 2011 (30mtrs)
- Geotechnical Soil Investigation at Gas pipeline from Kano – Katsina. -Subcontract award by Tracon/MPR Jan/Feb 2011 (30mtrs)
- Geotechnical Soil Investigation For Gas Supply Expansion Project at Escravos: Subcontract award by Geoville Deltaafrik / Chevron June/July 2010 (60mtrs)
- Geotechnical Soil Investigation of OBIO/OBEN Gas Pipeline Project from Omoku Rivers State – Oben Edo State; Subcontract award by Petrogas / MPR March/April 2010 (30mtrs)
- Geotechnical Soil Investigation for Gas pipeline from Ajokuta- Kano. -Subcontract award by Tracon/MPR Jan/Feb 2011 (30mtrs)
- Geotechnical & Geophysical Site Survey of Offshore Wind Energy Generation Plant at Monrovia, Contract awarded by Atlantic Geomantic Limited Liberia June/July 2010 (40mtrs)
- Near shore Geotechnical & Geophysical Site Survey at Monrovia Sea port. Contract awarded by Atlantic Geomantic Limited Liberia June/July 2010 (40mtrs)
- Sand search, Volumetric & Laboratory analysis of soil sample for Delta Glass Nig. Ltd (Completed)
22.Geotechnical Investigation for the proposed Technical College and Town Hall Project in Bonny for Nigeria Liquefied Natural Gas–Subcontractor from Polak Nigeria Limited. Feb/March 2009
- Nearshore Geotechnical Survey at Qua Ibom Terminal (QIT) Contract awarded by Geoville Consulting/ DeltaAfrik Engineering Company Limited / Exxon Mobil,. (Completed)
- Onshore Geotechnical Survey of IDOH & UBIT export pipeline Contract awarded by Geoville Consulting/ DeltaAfrik Engineering Company Limited / Exxon Mobil,. (Completed)