Geocadinal Integrated Services Limited has over Thirty Five (35) past and present projects, ranging from Surveying, Positioning, GIS, Borehole Drilling and Completion, Geotechnical Site Investigation, Geophysical survey and logging, water treatment system, water storage system and distribution and Environmental Services all over the country particularly in Niger Delta Region and other parts of the country.

 

We are particularly keen on this Trans Nigeria Gas Pipeline Project because we pioneered and undertook the all the field works in the first phase of this project called Ajaokuta-Abuja-Kano-Katsina pipeline route survey and Above Ground Facilities Geotechnical. (AAKK) By Atlas Engineering Nigeria Limited in February 2011.

 

LIST OF ONSHORE/OFFSHORE SURVEYING AND POSITIONING PROJECTS

 

 

NO

DESCRIPTION

CLIENT

YEAR

1

Rig Positioning of Borr Gerd from Asasa VA to
West Pindown Area (WD=42m)

Borr Drilling – Exxon Mobil

June 2020

2

Subsea Pipeline / Jacket Inspection and 3D Visualization Survey AT Forcados Field 6.5km
(WD=12m)

Stride Energy /SPDC

June,2020

3

Rig Positioning of Borr GROA from Oyot A to
West Pindown Area (WD=43m)

Borr Drilling – Exxon Mobil

May 2020

4

Rig Positioning of Trident XIV from OSO RH
to West Pindown Area (WD=21m)

Shelf Drilling / Exxon Mobil

May 2020

5

12’’ subsea Pipe lay and SBM Installation Survey Support from Beach to 15km
Offshore Lagos (WD -19m)

Bright Waters / Pinnacle Oil

Ongoing

6

Re-Establishment Survey of Isoko TTBR-1 Well Location, including Access Road And
Borrow Pit in Isoko Field, OML 26 (2.4km)

Nigerian Petroleum Development Company (NPDC)

April, 2020

7

PI, FP Survey Of Proposed WNGD-1 Well Location, Campsite And Route Survey Of Access Road/Flowline ROW in Isoko Field,
OML 26 (3.5km)

Nigerian Petroleum Development Company (NPDC)

March, 2020

8

Subsea and Platform Face Survey for Cluster
JA, Cluster 1 and NEFS (WD=12m)

Michharry/ SPDC

Feb, 2020

9

Rig Positioning of Borr Gerd at Asasa VA
(WD=42m)

Borr Drilling – Exxon Mobil

January 2020

10

Jack-Up Rig Positioning at OEFS Platform
(WD=12m)

Dewalyes – SPDC

Dec 2019

11

Rig Positioning at EA DPJ Platform
(WD=42m)

Borr Drilling – SPDC

Nov 2019

12

Rig Positioning at Asasa VB

Borr Drilling – Exxon Mobil

Sept 2019

13

Pre-Engineering Survey Of proposed 12” Multiphase Export Pipeline AMD2 and IKD1 and 12” Water Injection Pipeline AMD3 and
IKD1 at IKIKE Field within OML99 (AMENAM-KPONO). 43km (WD=42m)

GEMS / Deltatak / Total E&P

Sept 2019

14

Topographical, Aeria Mapping and Geotechnical Soil Investigation of BUA
Refinery Site in Ibeno, Akwa Ibom (48 Ha)

BUA Refinery

July,2019

15

Habour Survey for ship anchorage at Lagos Bar
(24km x15km)

Nigeria Port Authority

July,2019

16

Subsea Pipeline / Jacket Inspection (32km)

Rosesmith / Agip

June,2019

17

Rig Positioning at Oyot A (WD=43m)

Borr Drilling – Exxon Mobil

June,2019

18

Rig Positioning at Usari FC (WD=32m)

Borr Drilling – Exxon Mobil

April, 2019

19

Jack-Up Rig Positioning at OSO B Platform
(WD=21m)

Dewalyes – Exxon Mobil

April 2019

20

Meji subsea Flexible pipe lay Survey Support
37km (WD=11m)

Marine Platforms/ Chevron

March, 2019

21

Jack-Up Rig Positioning at CLUSTER,6,7,2,4
Platforms (WD=11m)

Dewalyes – SPDC

March, 2019

22

Jack-Up Rig Positioning at EDOP QA
Platform(WD=43m)

Dewalyes – Exxon Mobil

February, 2019

23

Jack-Up Rig Positioning at NEFS
Platform(WD=12m)

Dewalyes – SPDC

February, 2019

24

As-Built/ As-Trench Survey for SSSGEP
Pipeline 15km (WD=42m)

Saidel /SPDC

February, 2019

25

Geotechnical Survey of SBM 1&3 for BOP Restoration Project (WD=41m)

OIS/ Exxon Mobil

January, 2018

26

Identification And Charting Of Abandoned Offshore Platforms And Structures – Western
Zone – A 20km x20km (WD=42m)

NIMASA

January, 2019

27

6" X 6km Cluster JA – North bank CPF
FYNAG Flowline (WD=14m)

Micharry /SPDC

January, 2019

28

Free Span Survey for Southern Swamp Sales
Gas Evacuation Pipeline 15km (WD=42m)

Saidel /SPDC

December,2018

29

Pre-Construction Survey for Meji Flexible
pipe Line 37km (WD=11m)

Marine Platforms/ Chevron

December,2018

30

Pre-Construction Survey 20’’ Meren-Okan
WYE Pre Installation Survey 4km (WD=14m)

DeltaTek Offshore/ Chevron

December,2018

31

16’’ SSSGEP Pipe lay Survey Support

Saidel /SPDC

October,2018

32

Geophysical Survey of SBM 1&3 for BOP
Restoration Project 4x4km (WD=41m)

OIS/ Exxon Mobil

September, 2018

33

Bathymetric and Metocean Survey of Ondo
Free Trade Zone 43km (WD=750m)

Ondo State Govt

August, 2018

34

Pre-Construction Survey for Southern Swamp
Sales Gas Evacuation Pipeline 15km (WD=42m)

Saidel /SPDC

August, 2018

35

Usan Subsea Inspection (WD=962m)

Exxon Mobil/ GMT

May,2018

36

2D High Resolution Survey
6x6km (WD=42m)

Deltaafrik / Exxon Mobil

April,2018

37

Erha Subsea Asset Inspection
(WD=750m)

Exxon Mobil/ GMT

March,2018

38

Jack-Up Rig Positioning at UBIT GN Platform
(WD=42m)

Dewalyes – Exxon Mobil

February 2018

39

Jack-Up Rig Positioning at UBIT GN Platform
(WD=42m)

Dewalyes – Exxon Mobil

January 2018

40

Pipeline route Survey for Southern Swamp
Sales Gas Evacuation Pipeline 15km (WD=22m)

Marine Platform / SAIDEL/ SPDC

On-going

38

Jack-Up Rig Positioning at Estuary Cluster
(Well-020) (WD=8m)

Dewalyes – SPDC

December, 2017

39

OQPP Near shore / Onshore Pipeline Route
Survey 12km (WD=8m)

Deltaafric / Exxon Mobil

Dec, 2017

Nigerian News

Guardian Newspapers
ThisDay Newspapers
The Punch Newspapers
Sunnews Newspapers
Vanguard Newspapers
Tribune Newspapers
 
 
Our Vision

Our vision is to be the most reputable and profitable energy Service Company in the world.

Our Mission Statement

To our:

  • Employees: Provide the opportunity to learn, grow and enjoy the value created by their effort.

  • Customers: Provide leading edge solutions, act with urgency/integrity and most of all develop long-term relationships by delivering memorable results.

  • Stakeholders: Create value by achieving returns that meet or exceed their expectations

Our Policy Statement

The short and long term aim of GEOCADINAL INTEGRATED SERVICES LIMITED is to become the industry leader in all our product lines through distinction in efficiency, technology, Quality Health Safety and Environment.

In pursuing this objective, GEOCADINAL INTEGRATED SERVICES LIMITED is committed to achieving superior satisfaction levels for its external and internal customers through Quality Management while complying with applicable standards and specifications.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Next page

Our Capabilities

We have very high technical, practical and prof calibres of men

 Professional Services

Nigerian Engineers & Technicians with vast experience in Project Management

Health Safety & Environ.

We continue to strive towards a healthier & safer environment for all employees.

Current Executed Project

GISL has has over fifteen (15) past and present projects

 
Home   |   Disclaimer   |   GISL © 2010.   |   All rights reserved.