GISL PROJECT EXECUTION HISTORY

Over the years, Geocadinal Integrated Services Limited has successfully undertaken and completed various projects in and outside of Nigeria with 100% client satisfaction. The list of Onshore and Offshore projects includes but not limited to the following:

  S/NO DESCRIPTION CLIENT YEAR
1 Okoro Gas Lift Remediation Survey Services AMNI International Petroleum Development Company Limited On-Going
2 48Km  Isene Gas Pipeline Project Dangote  / Blue Star Gas Ltd On-Going
3 Onshore Survey of 4×30000 BBLS Crude Oil Storage Tank at Oredo Flow Station NPDC March 2021
4 Bathymetric Survey of Badagry Creek Channel Lagos POLARIS MARINE / RAIN OIL / TECNO OIL December 2020
5 Bathymetric Survey of NLNG Bonny Jetties EVOMEC / NLNG October 2020
6 12 inch AG Pipeline Buckle Inspection Survey Michharry / SPDC August 2020
7 Subsea Pipeline / Jacket Inspection and 3D Visualization Survey at Forcados Field Strides Energy / SPDC June 2020
8 Rig Positioning  of Borr Gerd from Asasa VA to West Pin down Area Borr Drilling / Exxon Mobil June 2020
9 Rig Positioning of Borr GROA from Oyot A  to West Pin down Area Borr Drilling / Exxon Mobil May 2020
10 Rig Positioning of Trident XIV from OSO RH to West Pin down Area Shelf Drilling / Exxon Mobil May 2020
11 12’’ subsea Pipe lay and SBM Installation Survey Support from Beach to 15km Offshore Lagos Bright Waters / Pinnacle Oil August 2020
12 Re-Establishment Survey of Isoko TTBR-1 Well Location, including Access Road And Borrow Pit in Isoko Field, OML 26 Nigerian Petroleum Development Company (NPDC) April 2020
13 PI, FP Survey Of Proposed WNGD-1 Well Location, Campsite And Route Survey Of Access Road / Flow line ROW in Isoko Field, OML 26 Nigerian Petroleum Development Company (NPDC) March 2020
14 Subsea and Platform Face Survey for Cluster JA, Cluster 1 and NEFS Michharry / SPDC February 2020
15 Rig Positioning of Borr Gerd at Asasa VA Borr Drilling / Exxon Mobil January 2020
16 Jack-Up Rig Positioning at OEFS Platform Dewalyes / SPDC December 2019
17 Rig Positioning at EA DPJ Platform Borr Drilling / SPDC November 2019
18 Rig Positioning at Asasa VB Borr Drilling / Exxon Mobil September 2019
19 Topographical, Aerial Mapping and Geotechnical Soil Investigation of BUA Refinery Site in Ibeno, Akwa Ibom BUA Refinery July 2019
20 Harbor Survey for Ship Anchorage at Lagos Bar Nigeria Port Authority July  2019
21 Subsea Pipeline / Jacket Inspection RusselSmith / Agip June 2019
22 Borr Groa Rig Positioning at Oyot A Borr Drilling / Exxon Mobil May 2019
23 Borr Gerd Rig Positioning at Usari FC Borr Drilling / Exxon Mobil April 2019
24 Jack-Up Rig Positioning at OSO RC Platform Dewalyes / Exxon Mobil April 2019
25 Meji Flexible pipe lay Survey Support Marine Platform  / Chevron March 2019
26 Jack-Up Barge Positioning at CLUSTERs 6, 7, 2 and 4 Platforms Dewalyes / SPDC March 2019
27 Jack-Up  Barge Positioning at EDOP QA Platform Dewalyes / Exxon Mobil February 2019
28 Jack-Up  Barge Positioning at NEFS Platform Dewalyes  / SPDC February 2019
29 As-Built/ As-Trench  Survey for  16 inch SSSGEP Pipeline Saidel  / SPDC February 2019
30 Geotechnical Survey of SBM 1&3 for BOP Restoration Project OIS / Exxon Mobil January 2018
31 Identification And Charting Of Abandoned Offshore Platforms And Structures – Western Zone – A NIMASA January 2019
32 6″ X 6km Cluster  JA – North bank CPF FYNAG Flow line Micharry  / SPDC January 2019
33 Free Span Survey for Southern Swamp Sales Gas Evacuation Pipeline Saidel / SPDC December 2018
34 Pre-Construction Survey for Meji Flexible pipe Line Marine Platforms / Chevron December 2018
35 Pre-Construction Survey 20’’ Meren-Okan WYE Pre Installation Survey Deltatek Offshore / Chevron December 2018
36 16’’ SSSGEP Pipe lay Survey Support Saidel / SPDC October 2018 – February 2019
37 Geophysical Survey of SBM 1&3 for BOP Restoration Project OIS/ Exxon Mobil September 2018
38 Bathymetric and Metocean Survey of Ondo Free Trade Zone Ondo State Government August 2018
39 Pre-Construction Survey for  Southern Swamp Sales Gas Evacuation Pipeline Saidel / SPDC August 2018
40  Usan Subsea Inspection Exxon Mobil / GMT May 2018
41 2D High Resolution and EIA Geophysical Survey, Usari Alternate Development Project

 

Deltaafrik  / Exxon Mobil April 2018
42 Erha Subsea Asset Inspection Exxon Mobil / GMT March,2018
43 Jack-Up Rig Positioning at UBIT GK Platform Dewalyes  / Exxon Mobil February 2018
44 Jack-Up Rig Positioning at UBIT GJ Platform Dewalyes  / Exxon Mobil January 2018
45 Pipeline route Survey for  Southern Swamp Sales Gas Evacuation Pipeline Marine Platform  / SAIDEL/ SPDC December 2017
46 Jack-Up  Barge Positioning at Estuary Cluster (Well-020) Dewalyes  / SPDC December 2017
47 OQPP Near shore / Onshore Pipeline Route Survey Deltaafrik  / Exxon Mobil December 2017
48 Jack-Up  Barge Positioning at UNAM-CC Platform Dewalyes  /  Exxon Mobil November 2017
49 Marine Debris and Jack-up approach Survey (Adjacent to NEFS for JUB SSS Installation Works) Technixs / SPDC July  2017
50 Bathymetry and  Wreck Survey Humber Marine Werks / Aveon Offshore June 2017
51 Search and Recovery Survey Nigerian Navy March 2017
52 Meren Platform Cable Lay Survey Chevron/ Era J March 2017
53 24’’ Okan Gas Import Pipeline post-installation survey Chevron Field Ranger Subsea / Chevron February 2017
54 24’’ Okan Gas Import Pipeline installation positioning survey support at Chevron Field Ranger Sub-sea / Chevron December 2016  –  January 2017
55 24’’ Okan Gas Import Pipeline pre-installation Survey at  Chevron Field Ranger Subsea / Chevron November 2016
56 OQPP Onshore Pipeline and Geotechnical Survey Exxon Mobil / Deltaafrik October – November 2016
57  Usan Subsea Baseline Inspection Exxon Mobil/ Retech September 2016
58 12’’ subsea Pipe lay Positioning Support from South bank to NEFS Conoil Field Ranger Subsea / Conoil February  –
October 2016
59 Subsea Cable shore Landing Protection and Burial at Goshen Beach Lagos Vewat / SAT 3 Consortium March 2015
60 Subsea Cable Lay  Positioning Support at  Lagos Offshore for SAT 3 Consortium Humber Marine  / SAT 3 Consortium December 2015
– January 2016
61 Pre-Lay Survey for Fiber Optics Subsea Cable Lay  at Lagos Offshore for SAT 3 Consortium Vewat  / SAT3 Consortium November 2015
62 Post Wreck and Debris Survey Chevron / Humber Marine November 2015
63 12’’ Subsea Pipe lay Positioning Support from South bank to NEFS Forcados Field Gladtrico /OPI/SPDC August 2015 –
February 2016
64 33kva Subsea Fibre Optics Cable Lay  Positioning Support at Forcados Field NATONY / OPI/ SPDC June 2015
65 12’’ Pipeline route survey from South bank to NEFS Forcados Field OPI / SPDC March 2015
66 Pre-Lay Survey for Subsea Cable Lay  at Forcados Field NATONY / OPI/ SPDC February 2015
67 Scarabeo 3 Semi-Submersible Rig Position @ OKD-5 Okwori Field Addax Petroleum / Earldom Nigeria December 2014
68 Subsea Cable Lay  pre-installation survey at Forcados Field OPI / SPDC November 2014
69 Scarabeo 3 Semi-Submersible Rig Position @ OKD-27 Okwori Field Addax Petroleum / Earldom Nigeria October 2014
70 Pipeline route survey of Trans Ramos pipeline Agge Field Nigerdive  / SPDC October 2014
71 Escravos River Pipeline Crossing Survey Nigerdive  / SPDC September 2014
72 Scarabeo 3 Semi-Submersible Rig Position @ Asha 6 Okwori Field Addax Petroleum / Earldom Nigeria August 2014
73 Topographical Survey of Flow line and Well Fix of Well O, N, P in Oredo Field Nigerian Petroleum Development Company (NPDC) July 2014
74 Scarabeo 3 Semi-Submersible Rig Position @ Ok-14 Okwori Field Addax Petroleum / Earldom Nigeria June 2014
75 Offshore pipeline Route Survey at Agee SPDC / Nigerdive Ltd May 2014
76 Topographical Survey of Access road and Hydrographical Survey of Orashi River Nigerian Petroleum Development Company (NPDC) April 2014
77 Swath Bathymetric Survey of Escravos Entrance NPA / Humber Marine Werks Company Ltd March 2014
78 Scarabeo 3 Semi-Submersible Rig Position @ ok-D10 Okwori Field Addax Petroleum / Earldom Nigeria February 2014
79 Offshore Pipeline Route Survey MG3 / Afren January 2014
80 Scarabeo 3 Semi-Submersible Rig Position @ ok-15 Okwori Field Addax Petroleum / Earldom Nigeria November 2013
81 Scarabeo 3 Semi-Submersible Rig Position @ okd-2 Okwori Field Addax Petroleum / Earldom Nigeria September 2013
82 Scarabeo 3Semi-Submersible Rig Position @ ok-29 Okwori Field Addax Petroleum / Earldom Nigeria August 2013
83 Geophysical / Seabed survey of Warri channel to Escravos Fairway Buoy ( 228km) NPA / Humber Marine Werks Company Ltd March 2013
84 Swath Bathymetric Survey of Escravos Shipping Channel Entrance NPA / Humber Marine Werks Company Ltd December 2012
85 Rig Positioning @ Okono I NPDC September 2012
86 Sea Bed / Geophysical site survey for Rig Positioning @ Okono H & I Nigerian Petroleum Development Company. August 2012
87 Geo-hazard survey For Rig Positioning of OSO PP Exxon Mobil  /GOSL May 2012
88 Geotechnical Soil Investigation for the Transmission Tower Lines. PHCN/TCN/IPP (Sub-contract Miden Systems Ltd.) July 2011
89 Geotechnical and Topographic Investigation of Ajaokuta-Abuja-Kano-Katsina Gas pipeline Route Survey. Federal Ministry of Petroleum Resources, Sub-contract from Atlas International Engineering Services 2011
90 Topographic Survey for Gas Supply Expansion Project (GSEP). Chevron Nigeria Limited / Hyundai Heavy Industries, contract awarded by Worley Parsons R & E Houston 2010
91 Near shore Geotechnical & Geophysical Site Survey at Monrovia Sea Port Atlantic Geomatics Limited Liberia 2010
92 Near shore Geophysical For Critical Crude Pipeline Replacement Project. Mobil Producing Nigeria Unlimited. Contract awarded by Deltaafrik Engineering Limited 2009